Ridges and Gables

A triple glazed window is craned in.   The walls are so thick we can fit a Veterinary Nurse into the insulation zone!   The huge glulam timber ridge beam is dropped into place by Nathan and Neil.    

New Vet Surgery passive base goes down in just one week!

In one week these amazing guys from MBC Timber, Harry, Shaun, Brian and Tony, working from 7 till 7 every day of the week, have installed the insulation base laid on compacted stone with steel mesh and underfloor heating  laid over.  Eco-Concrete will be poured next week inside the base  in readiness for the off-site timber  frame arriving in …

New Vet Surgery passive base goes down in just one week! Read More »

Work underway on the new surgery- At last!

    These guys from a specialist passivehousefirm , MBC Timber, laid a layer of levelled hardcore first and then sand ready for the insulated slab next week! They don’t mess around! The pipes sticking up are pre-placed drains- you need lots of these in a Vet Surgery!